Warsaw 2010
Construction of expressway (S-8) – Armii Krajowej route from "Konotopa" junction to "Prymasa Tysiąclecia" junction.
Investor: Generalna Dyrekcja Dróg Krajowych i Autostrad
General Contractor: STRABAG SP. Z O.O.
In July 2010 P.B.I. PEBIS Sp. z o.o. proceeded to the construction of storm water drainage system on expressway (S-8).
The task we performed included:
- concrete sewer collectors diameter from DN200 to DN800 with a total length of about 3800m,
- 126 pieces of reinforced concrete wells , diameter from DN1200 to DN1600 including 7 sludge sedimentation tanks, 6 coalescent separators and 2 sewage pumping stations,
- 165 street inlets with sedimentation tank,
- 630m pressure lines made of PE pipes.