Janki 2015
S8 Opacz-Paszków dual carriageway
Investor: Generalna Dyrekcja Dróg Krajowych i Autostrad
General Contractor: STRABAG Sp. z o.o.
P.B.I. PEBIS Sp. z o.o. constructed:
1. storm water network
- reinforced concrete pipes DN500-DN1200; total lenght 5587m
- polypropylene PP pipes DN200-DN600; total lenght 12295m
- PCV pipes DN160 - DN400; total lenght 9080m
2. Reinforced chamber DN1000 - DN2000. In total 515 items
3. Concrete chamber DN500. In total 985 items
4. Open storage reservoir 7 items
5. Underground storage reservoir, GRP pipes. Total lenght 87m
6. Carriageway drainage, NPCW DN113 pipes. Total lenght 15163m.