In September 2010 P.B.I. PEBIS sp. z o.o. proceeded to the construction of the storm water network on the S-2 expressway from Konotopa to the airport.

 

We constructed:

- storm water network of Glassfiber Reinforced Plastic pipes, diameter from DN200 to DN1200 with a total length of 33960m,

- Glassfiber Reinforced Plastic (GRP) chambers a diameter from  DN1200 to DN1600 – total amount 835,

- reinforced concrete chambers -total amount 152,

- drainage WIPRO pipe a total length 75m,

- catch basins with sumps total amount 1207,

- storage reservoirs of GRP DN1800 to DN3000 pipes a length of 640m,

- assembly of sumps, separators, sewage pumping stations and other,

- bridges drainage.